I read 8 books in the month of February. I would have had a couple of more, but I kind of stalled out the last two weeks of the month.
1. I need to square up my Farmer's Wife blocks which are finished. I would at least like to get that finished this month, and possibly start to put the lattice around it. I also need to decide on the setting squares. If I do just 5 a day I would be done by the end of the month having the quilt blocks squared up.*** Check all squared up, on the design wall in a pleasing layout and I am working on the sashing, cornerstones, and I finally chose a color for the setting blocks.
2. Setting blocks for the 2014 Aurifil block of the month.
I started to work on it, and figured out that I had not enlarged my pattern correctly. So I have to start it over to get it right. At least I have the fabric to finish it.
3. Yellow Brick Road quilt I would love to get this one finished up.
I actually buried this one under a ton of fabric...well maybe not a ton, but as I was cleaning it up it seemed like it.
4. Finish up Step 2 of Grand Illusion and maybe work a bit on step 3.
I finished step 2 which seemed like it took forever but step 3 is not a whole lot better!
5. My quilt group BOM. I am about 12 blocks behind now! There are some ladies that actually have finished their quilts. Five blocks.
Twenty setting blocks.
I realized that I needed to make a lot more blocks and the alternates to get enough to make this a big quilt. 6. Quilting for charity quilt. I feel bad I haven't worked on this quilt since before Christmas.
7. Quilting for Basket Case Quilt which I almost have loaded on my frame.
Got the quilt loaded started to quilt, and all of a sudden had tension problems Grrr! I had a bit of unpicking to do to start on it again.
8. Maybe work on some drunkard's path blocks. After finally getting all the rearranging done in the house I haven't touched these since before Christmas either.
9. Some slow stitchingHaven't touched my Words of Wisdom redwork other than to move it from spot to spot.
But I have worked a wee bit on my tractor Cross stitch.
Overall not a bad month, but I know I didn't always use my free time to the optimum and probably could have done a bit more if I had.
I did make a mini for a friend as a thank you which I feel turned out sweet.
I also did a dog pillow for one of the Quilt guild charities.
I also redid an old Christmas stocking saving the Cross stitch and using it to make a sew sweet pillow.
I am looking forward to March, warmer temperatures and days filled with smiles. How was your month?
Don't forget my giveaway. You can enter here.
a productive month for sure.
ReplyDeletelove love love my little heart wallhanging. she is in my sewing room where I can look at her as I sew. <3
My month was not very productive at all--I got stalled underneath all that snow (LOL). But I have great plans for March: finally finish binding Sleigh Bells Ring and Georgie Peorgie! That's as far ahead I can think as S N O W is clogging my brain!! Hugs, Julieose
ReplyDeleteI hope for warmer days to but they are saying snow or ice later this week
ReplyDeleteYou did get a lot done ! Sunny days and warmer weather will be good for everyone I think ! Your quilt group BOM is the prettiest colors...love it !
ReplyDeleteIt never ceases to amaze me with all you achieve in a month. All that and working and family commitments too. You put me to shame.
ReplyDeletelovin' the color combo of those batik blocks.
ReplyDelete